Friday, February 5, 2010

Foundation Exterior Forms are up


The exterior forms for the foundation were put up today, so it really looks like progress is being made even though it will still be another 4 days or so before the concrete is poured. 


The reinforcments used to hold the rebar in place are very labor intensive to install.  Each one of these was put in by hand, and the rebar lattice will be threaded through them as the next few days of prep work for the pour take place.



Ruby has been keeping an eye on the proceedings from the front yard of our rental, which you can spot in the distance on the top picture in this post - the camper is parked in the driveway.  This is a shot of her on top of one of the dirt piles as she sniffs around the site to make sure nothing is out of place.